Project Value: £1.4 Million. The scheme consisted of construction of a new two storey teaching space together with a new sports hall inclusive of two halls, one with four badminton courts and a basketball court together with a fitness suite on a first floor mezzanine between the halls and at ground floor level full changing and showering facilities. In addition a full M&E refurbishment of a two storey science block and three storey teaching space for IT and modern languages was also incorporated. The project was completed within the timescale required and for the GMP set by the client. It was a design and build PFS project and the Contractor, Clugston Construction Ltd, engaged the M&E designers but we were fully involved in the DT process from the initial ER through to final design and obviously through construction to completion in September 2013.