Case Studies

From here you can browse our current and previous projects. Each case study will give you information on our input into the project and also allow you to browse images illustrating exactly what we did.

New Residential Development, Flanshaw, Wakefield

Posted on Thursday, November 22nd, 2018

Working alongside Triton Construction Ltd on this scheme for the Witherslack Group, who specialise in providing care for youngsters with special, emotional and mental health needs including autism and asperger’s. The Project is a new seven bedroom two storey building that includes dining and lounge facilities and staff areas. Our electrical and mechanical works included […]

Click here to read more...

Yorkshire Sculpture Park, Wakefield – New Visitors Centre

Posted on Tuesday, November 20th, 2018

Working alongside William Birch & Sons on Yorkshire Sculpture Park’s new £3.6 million visitor centre – to be known as The Weston as a result of significant support from family grant-maker, The Garfield Weston Foundation, and will open to the public on Saturday 30th March 2019. Built on a historic quarry site within the 18th-century […]

Click here to read more...

Sangwell Court, Clowne, Derbyshire

Posted on Tuesday, November 13th, 2018

Working alongside Strategic Team Group on the construction of a new two storey detached care home, incorporating 16 self-contained one-bedroom apartments in the supported living unit, and 4 apartments in the capacity care unit. The property is fully supported by a dedicated 24/7 on site staff team, and services are offered to people with learning […]

Click here to read more...

Helme Church of England Academy, Meltham, Holmfirth, Huddersfield

Posted on Tuesday, October 16th, 2018

We are delighted to have been working with AHR Building Consultancy Ltd on the heating replacement works. Helme Church of England Academy is located in Meltham, the school’s religious denomination is Church of England. The mixed-sex primary school has a capacity of 148 pupils, aged from four up to eleven, and the type of establishment […]

Click here to read more...

New Crematorium, Straight Mile, Babworth, Retford

Posted on Tuesday, September 18th, 2018

Working alongside Esh Build on the construction of a new Crematorium for Crematoria Management Ltd. The new building had been especially designed in the local rural character in order to blend into the countryside, offering a place of peace and tranquillity and situated within the glorious countryside that surrounds Bassettlaw. The chapel is light and […]

Click here to read more...

Folk Hall, New Earswick, York

Posted on Thursday, August 2nd, 2018

  Working alongside Strategic Team Group, we are delighted to have been part of the latest refurbishment works at Folk Hall. Our mechanical and electrical works included:– Survey of the existing services, strip out existing services, LV distribution, containment, small power, earthing & bonding, voice & data cabling, lighting, mechanical wiring, lift power supplies, fire […]

Click here to read more...

Leeds College of Music – The Venue

Posted on Thursday, October 5th, 2017

We are delighted to have been working alongside Esh Build on the refurbishment works at Leeds College of Music – The Venue. The works included alterations to the existing structure and extension at rooftop level to provide an enlarged bar and break-out space adjacent to the auditorium. Leeds College of Music is a music conservatoire […]

Click here to read more...

Wakefield College Performing Arts Building

Posted on Thursday, February 5th, 2015

Project Value: £180K – The scheme consisted of the conversion of the existing Wakefield Museum Building into the new Wakefield College Performing Arts Building, creating a new performance venue with drama studios, theatre, teaching areas etc. Our electrical works consisted of low voltage distribution, small power, voice and data, general and emergency lighting, external lighting, […]

Click here to read more...

Sheffield Royal Hallamshire Hospital – D Floor Catering Facilities

Posted on Wednesday, November 19th, 2014

We are pleased to announce the completion of Sheffield Royal Hallamshire Hospital. Project Value: £851K.  The scheme consisted of the supply, installation and commissioning of the Mechanical and Electrical Systems for the refurbishment of Level ‘D’ Catering Areas.  The works consisted of the isolation and strip out of the existing Electrical & Mechanical services, and replaced with […]

Click here to read more...

Cleethorpes Academy

Posted on Friday, October 25th, 2013

Project Value: £1.4 Million. The scheme consisted of construction of a new two storey teaching space together with a new sports hall inclusive of two halls, one with four badminton courts and a basketball court together with a fitness suite on a first floor mezzanine between the halls and at ground floor level full changing […]

Click here to read more...